Doha Metro Phase 1 - Red Line & Green Line - Depots & Stabling Yards
The Doha Metro Phase 1 is an integral part of the Qatar Railway Development Programme.
Phase 1 consists of the design and construction of an operational driverless Metro network with line length of 86.23km, 36 stations of which 35 are fully equipped stations, a main depot and two stabling yards, track work, railway systems and rolling stock.
Employer | Qatar Rails |
Contractor | Fujita Corporation |
Consultant | Atkins |
Country | Qatar |
Scope | Supply, Fabrication & Erection |
Steel Tonnage | 12,000 Ton |